The GP Chirano Plant

Steam Turbine Power Plant

Kinross Gold Corporation is a leading mining company with worldwide operations. Chirano Gold Mine Ltd (CGML) is one of the top performing mines in the Kinross network. CGML expressed interested in Genser Energy in acquiring a stable and reliable power supply to facilitate its mining operations.

Genser and CGML signed a Power Purchase Agreement (PPA) in 2011 to supply power to CGML’s mining concession in Chirano located in the Bibiani-Anhwiaso-Bekwai district in the Western Region of Ghana . Shortly after signing the PPA, Genser commenced the construction of the GP Chirano Plant which is designed to be built in two phases.

Phase One the GP Chirano Plant which is a 30.0MW Steam Turbine Plant in an Integrated Gasification Combined Cycle (IGCC) configuration  was commissioned in June 2016.  It is made up of four (4) Gasifier units, four (4) Heat Recovery Steam Generators (HRSG) and one (1) Steam Turbine Generator (STG).

Phase Two of the Plant will focus on capacity expansion with the aim of generating up to 60.0MW in a combined cycle configuration.

The uniquely designed GP Chirano Plant, is primarily fueled by LPG/ and or Coal. Power to CGML will be transmitted at 33 kV and 50Hz in an  island mode.